When building a house, the number of days required to build varies inversely with the number of workers. One house was built in 70 days by 12 workers how many days would it take to build a similar house with 40 workers?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Write the sine and cosine values of a, b, respectively, in the figure for (1) and (2) + explanation.
Answers: 1
question
Mathematics, 21.06.2019 22:10
This is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 5 terms.
Answers: 2
question
Mathematics, 21.06.2019 23:00
Solve the problem by making up an equation. a man could arrive on time for an appointment if he drove the car at 40 mph; however, since he left the house 15 minutes late, he drove the car at 50 mph and arrive 3 minutes early for the appointment. how far from his house was his appointment?
Answers: 1
question
Mathematics, 22.06.2019 00:20
Data for the height of a model rocket launch in the air over time are shown in the table. darryl predicted that the height of the rocket at 8 seconds would be about 93 meters. did darryl make a good prediction? yes, the data are best modeled by a quadratic function. the value of the function at 8 seconds is about 93 meters. yes, the data are best modeled by a linear function. the first differences are constant, so about 93 meters at 8 seconds is reasonable. no, the data are exponential. a better prediction is 150 meters. no, the data are best modeled by a cubic function. a better prediction is 100 meters.
Answers: 2
You know the right answer?
When building a house, the number of days required to build varies inversely with the number of work...
Questions
question
Social Studies, 20.09.2020 17:01
question
History, 20.09.2020 17:01