subject
Mathematics, 24.03.2020 23:08 gagedugan2019

A manufacturing plant supplies various engine components to manufacturers of motorcycles on a just-in-time basis. Planned production capacity for one component is 100 units per shift. Because of fluctuations in customers’ assembly operations, demand fluctuates and is historically between 80 and 130 units per day. To maintain sufficient inventory to meet its just-in-time commitments, Tracway’s management is considering a policy to run a second shift if inventory falls to 50 or below. For the annual budget planning process, managers need to know how many additional shifts will be needed. The fundamental equation that governs this process each day is: Ending inventory = Beginning inventory + Production - Demand Develop an Excel spreadsheet model to simulate 260 working days (one year) and count the number of additional shifts that are required. Use this variable as a forecast cell for a Crystal Ball simulation of the model to find a distribution of the number of shifts required over the next year. Then use the Crystal Ball Bootstrap tool to find the sampling distribution of the maximum number of additional shifts required and compute a 95% confidence interval for this statistic. Summarize your findings in a report to the plant manager.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Find the required measurements of the following trapezoids. a = 8 cm b = 16 cm h = 10 cm
Answers: 2
question
Mathematics, 21.06.2019 19:30
Find the actual dimensions of the box. the side length are in meters and integers. the surface area of the box is 104 m2 and volume of the box is 60 m3.
Answers: 1
question
Mathematics, 21.06.2019 21:00
An account with a $250 balance accrues 2% annually. if no deposits or withdrawals are made, which graph can be used to determine approximately how many years will it take for the balance to be $282? it's e2020 ni️️as
Answers: 1
question
Mathematics, 21.06.2019 21:30
Taylor wants to paint his rectangular deck that is 41 feet long and 24 feet wide. a gallon of paint covers about 350 square feet. how many gallons of paint will taylor need to cover the entire deck? round your answers to two decimal places when necessary.
Answers: 1
You know the right answer?
A manufacturing plant supplies various engine components to manufacturers of motorcycles on a just-i...
Questions
question
Mathematics, 30.10.2021 04:10
question
Mathematics, 30.10.2021 04:10
question
Spanish, 30.10.2021 04:10