subject
Mathematics, 23.03.2020 23:31 brae72

A contractor requires a cement mix that is 70% sand and 30% cement. He has 1400 kg of a cement mix that is 80% sand and 20% cement. How much cement should he add to this 1400 kg cement mix so that he gets the required mix?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
An appliance salesman sets a goal to sell an average of 6 appliances per day for the first two weeks of his new job. the dot plot shows the number he sold each day during the first 13 days. what is the minimum number of appliances he must sell on the 14th day in order to reach his goal? a) 5 b) 6 c) 7 d) 8
Answers: 1
question
Mathematics, 21.06.2019 19:00
What are the solutions of the system? solve by graphing. y = x^2 + 3x + 2 y = 2x + 2
Answers: 1
question
Mathematics, 21.06.2019 19:30
In need of in the diagram, ∠abc is a right angle. ∠dbc = 30°27'40". find the measure of ∠abd.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The two cylinders are similar. if the ratio of their surface areas is 9/1.44 find the volume of each cylinder. round your answer to the nearest hundredth. a. small cylinder: 152.00 m3 large cylinder: 950.02 m3 b. small cylinder: 972.14 m3 large cylinder: 12,924.24 m3 c. small cylinder: 851.22 m3 large cylinder: 13,300.25 m3 d. small cylinder: 682.95 m3 large cylinder: 13,539.68 m3
Answers: 2
You know the right answer?
A contractor requires a cement mix that is 70% sand and 30% cement. He has 1400 kg of a cement mix t...
Questions
question
English, 19.02.2021 19:20
question
Mathematics, 19.02.2021 19:20
question
Mathematics, 19.02.2021 19:20
question
Mathematics, 19.02.2021 19:20
question
Mathematics, 19.02.2021 19:20