subject
Mathematics, 20.03.2020 09:09 Yuii

A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot liquid silicon on a lake of molten tin. The liquid silicon spreads out evenly on the tin and then cools into glass. It is a process that must continue uninterrupted hours a day, so adjustments to equipment and materials are ongoing. Assume that inspectors work eight-hour shifts, watching the glass ribbon as it flows from the lake of tin, marking and counting the number of defects on the new glass. The number of defects identified by the inspectors for a -hour period is shown below

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
What are the vertical asymptotes of the function f(x) =5x+5/x2 + x-2
Answers: 1
question
Mathematics, 21.06.2019 14:50
What is [tex] {7}^{98 + \sqrt{4} } - 3 \times (64 \div 2 + 4 - 36) \times a = a + 36[/tex]?
Answers: 3
question
Mathematics, 21.06.2019 18:30
Agraphic designer created a logo on eight and a half by 11 inch paper. in order to be placed on a business card, the logo needs to be one and 7/10 inches by 2 and 1/5 in. what is the scale factor of the dilation
Answers: 1
question
Mathematics, 21.06.2019 19:30
Is the figure congruent? yes or no?
Answers: 1
You know the right answer?
A glass factory makes a continuous ribbon of glass by pouring a continuous stream of hot liquid sili...
Questions
question
Mathematics, 25.11.2019 21:31
question
English, 25.11.2019 21:31
question
Mathematics, 25.11.2019 21:31