Mathematics, 19.03.2020 02:32 Karamatullah

The total cost for a production process is equal to $1,000 plus two times the number of units produced. The mean and variance for the number of units produced are 500 and 900, respectively. Find the mean and variance of the total cost.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Refer to the table below if needed. second quadrant third quadrant fourth quadrant sin(1800- - cos(180° -) tan(180°-e) =- tane cot(1800-0) 10 it to solo 888 sin(180° +c) = - sine cos(180° +) =- cose tan(180° +c) = tane cot(180° +o) = cote sec(180° + c) = - seco csc(180° +2) = - csce sin(360° -) =- sine cos(360° -) = cose tan(360° - e) =- tane cot(360° -) = -cote sec(360° -) = seco csc(360° -) = csco sec(180° -) = csc(180° -) = csca 1991 given that sine = 3/5 and lies in quadrant ii, find the following value. tane
Answers: 2
question
Mathematics, 21.06.2019 18:00
What is the area of mnp? 40 m2 60 m2 68 m2 127.5 m2
Answers: 2
question
Mathematics, 21.06.2019 23:50
What is the probably of getting heads when poing a coin and getting a number greater than or equal to 5 when rolling a single diea) 1/6b) 1/3c) 1/4d) 1/12
Answers: 2
question
Mathematics, 22.06.2019 01:00
Asandwich shop has 18 tables. each table seats up to 4 people. to find the greatest number of people that can be seated, you can solve p4 ≤ 18. which step is the best way to solve the inequality? plz asap i repeat plz
Answers: 2
You know the right answer?
The total cost for a production process is equal to $1,000 plus two times the number of units produc...
Questions
question
Mathematics, 11.03.2021 20:10