An activity has an optimistic time estimate of 25 days, a most likely estimate of 29 days, and a pessimistic estimate of 34 days. What is the expected duration of the activity

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
Identify whether the figure has plane symmetry, symmetry about an axis, or neither.
Answers: 1
question
Mathematics, 21.06.2019 15:00
Match each polynomial with its factorization.
Answers: 3
question
Mathematics, 21.06.2019 15:00
How many different triangles can be constructed with the angle measurements of 134° 10° and 36° ?
Answers: 3
question
Mathematics, 21.06.2019 16:00
Question part points submissions used suppose that 100 lottery tickets are given out in sequence to the first 100 guests to arrive at a party. of these 100 tickets, only 12 are winning tickets. the generalized pigeonhole principle guarantees that there must be a streak of at least l losing tickets in a row. find l.
Answers: 2
You know the right answer?
An activity has an optimistic time estimate of 25 days, a most likely estimate of 29 days, and a pes...
Questions
question
Physics, 31.08.2019 00:30
question
English, 31.08.2019 00:30