You have just used the network planning model and found the critical path length is 30 days and the variance of the critical path is 25 days. The probability that the project will be completed in 33 days or less is equal to (2 decimal accuracy)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Mickey needs to cut pieces of ribbon that are each 1 meter long tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long. how many 1 meter pieces of ribbon can he cut
Answers: 1
question
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. x^2 + 18x = 9x
Answers: 2
question
Mathematics, 21.06.2019 21:30
Joanie wrote a letter that was 1 1/4 pages long. katie wrote a letter that was 3/4 page shorter then joagies letter. how long was katies letter
Answers: 1
question
Mathematics, 21.06.2019 22:00
Jayne is studying urban planning and finds that her town is decreasing in population by 3% each year. the population of her town is changing by a constant rate.true or false?
Answers: 1
You know the right answer?
You have just used the network planning model and found the critical path length is 30 days and the...
Questions
question
Mathematics, 16.03.2020 19:36
question
English, 16.03.2020 19:37