subject
Mathematics, 07.03.2020 05:39 willoughbysierra

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.740 inches or greater than 0.760 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.02 inches.

What is the probability that the manufacturing line will be shut down unnecessarily? (Hint: Find the probability of observing an x in the shutdown range when the true process mean really is 0.75 inches. Round your answer to four decimal places.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Find the value of x. give reasons to justify your solutions! c ∈ ae
Answers: 1
question
Mathematics, 21.06.2019 21:00
The? half-life of a radioactive substance is 20 years. if you start with some amount of this? substance, what fraction will remain in 120 ? years
Answers: 1
question
Mathematics, 21.06.2019 21:30
The domain of a function can be represented by which one of the following options? o a. a set of output values o b. a set of f(x) values o c. a set of input values o d. a set of both input and output values
Answers: 3
question
Mathematics, 21.06.2019 23:40
For a function f(x), a) if f(7) = 22 then f^-1(22) = b) f^-1(f(c)) =
Answers: 2
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions