subject
Mathematics, 05.03.2020 18:39 barattah

Two new workers, Andy and Bob, were hired for an assembly line. Andy could process 12 units per minute after one hour and 15 units per minute after two hours. Bob could process 10 units per minute after one hour and 16 units per minute after two hours. Using the above model and assuming that P(0)=0, estimate the maximum number of units per minute that each worker is capable of processing.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Every rhombus is a square. true false
Answers: 2
question
Mathematics, 21.06.2019 22:00
Out of 50 students surveyed, 16 have a dog. based on these results, predict how many of the 280 students in the school have a dog.
Answers: 2
question
Mathematics, 21.06.2019 23:00
Solve for n. round to the tenths place, if necessary. 14.2 cups of flour6 loaves of bread= 20 cups of flour n
Answers: 2
question
Mathematics, 22.06.2019 00:30
Graph a point. start at your origin, move left 10 units, and then move up three units which ordered pair is the point you graphed
Answers: 2
You know the right answer?
Two new workers, Andy and Bob, were hired for an assembly line. Andy could process 12 units per minu...
Questions
question
Mathematics, 04.02.2022 21:50
question
Mathematics, 04.02.2022 22:00