subject
Mathematics, 03.03.2020 02:59 thajaalalqo

An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Translate the word phrase into a math expression. 15 fewer than the product of 4 and a number. (pls immediately)
Answers: 2
question
Mathematics, 21.06.2019 19:00
What are the solutions of the equation? 16x^2 + 24x + 5 = 5 a. 1/4, 5/4 b. -1/4, -5/4 c. -1/4, 5/4 d. 1/4 , -5/4
Answers: 1
question
Mathematics, 21.06.2019 19:00
Abag of jelly beans contain 13 pink, green, 20 yellow, 10 black, 7 red, and 11 orange jelly beans. approximately what percent of the jelly beans are pink and yellow?
Answers: 1
question
Mathematics, 21.06.2019 23:10
Tom travels between the two mile markers shown and then finds his average speed in miles per hour. select the three equations that represent this situation.
Answers: 1
You know the right answer?
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Questions
question
Physics, 28.07.2021 04:20