subject
Mathematics, 02.03.2020 19:43 ctyrector

An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/hour, how many minimum work stations will be needed

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
If jm equals 5x -8 and lm equals 2x -6 which expression represents jl
Answers: 1
question
Mathematics, 21.06.2019 18:00
Which shows the correct solution of the equation 1/2a+2/3b=50, when b=30?
Answers: 1
question
Mathematics, 21.06.2019 20:10
Right triangle xyz has a right angle at vertex y and a hypotenuse that measures 24 cm. angle zxy measures 70º. what is the length of line segment xy? round to the nearest tenth. 8.2 cm 8.7 cm 22.6 m 25.5 cm
Answers: 1
question
Mathematics, 21.06.2019 20:30
Can someone me with #s 8, 9, and 11. with just one of the three also works. prove using only trig identities.
Answers: 3
You know the right answer?
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you...
Questions
question
Chemistry, 18.11.2019 06:31
question
Mathematics, 18.11.2019 06:31