Mathematics, 26.02.2020 05:44 miraclewhipppp

Five jobs are waiting to be run. Their expected run times are 9, 6, 3, 5, and X. In what order should they be run to minimize average response time? (Your answer will depend on X.)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Which term best describes the association between variables a and b? no association a negative linear association a positive linear association a nonlinear association a scatterplot with an x axis labeled, variable a from zero to ten in increments of two and the y axis labeled, variable b from zero to one hundred forty in increments of twenty with fifteen points in a positive trend.
Answers: 2
question
Mathematics, 21.06.2019 18:50
Determine which expressions represent real numbers and which expressions represent complex number. asaaap! plis!
Answers: 1
question
Mathematics, 21.06.2019 21:40
Question 1 of 10 2 points different groups of 50 graduates of an engineering school were asked the starting annual salary for their first engineering job after graduation, and the sampling variability was low. if the average salary of one of the groups was $65,000, which of these is least likely to be the average salary of another of the groups? o a. $64,000 o b. $65,000 o c. $67,000 o d. $54,000
Answers: 2
question
Mathematics, 21.06.2019 22:00
Type the correct answer in each box. spell all the words correctly, and use numerals instead of words for numbers. if necessary, use / for the fraction bar(s).
Answers: 1
You know the right answer?
Five jobs are waiting to be run. Their expected run times are 9, 6, 3, 5, and X. In what order shoul...