subject
Mathematics, 16.02.2020 22:22 jaceechesick

A work crew spent four days paving a stretch of road. The table below shows
the length of road paved each day.
ROAD PAVING
Day
Length (miles)
Monday 5.5/6

Tuesday 6.3/6
Wednesday 8.4/6
Thursday 4.1/6

The entire length of the road will be 27 miles. What is the total remaining
length of road that needs to be paved after the four days?
Show your work.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
An appliance salesman sets a goal to sell an average of 6 appliances per day for the first two weeks of his new job. the dot plot shows the number he sold each day during the first 13 days. what is the minimum number of appliances he must sell on the 14th day in order to reach his goal? a) 5 b) 6 c) 7 d) 8
Answers: 1
question
Mathematics, 21.06.2019 16:20
Find the slope of a line given the following two points
Answers: 1
question
Mathematics, 21.06.2019 18:10
What is the equation in slope-intercept form of the linear function represented by the table? y -18 -1 -8 4 2 912 o y=-2x-6 o y=-2x+6 o y=2x-6 o y = 2x+6
Answers: 1
question
Mathematics, 21.06.2019 22:10
Use the spider tool located on page 1 of this activity to draw a 12-pointed star for the new logo. (hint: if the spider rotates 360 degrees -- or 720 degrees or 1080 degrees -- she will be facing in the same direction in which she started. when the spider is done drawing, you want her to be facing in the same direction in which she started. she'll be making 12 rotations, all the same size, so each rotation must be some multiple of 360/12 = 30 degrees.) urgently. been stuck on this problem for around 45 minutes now.! it should be easy if you're smart enough
Answers: 3
You know the right answer?
A work crew spent four days paving a stretch of road. The table below shows
the length of road...
Questions