subject
Mathematics, 15.02.2020 05:07 saucyboyFredo

The starting work part costs $2.25 in a batch production operation. Batch quantity = 100 parts. Each cycle, part handling time = 0.50 min, and operation time = 1.67 min. Setup time = 50 min. Equipment cost rate = $35.00/hr, and labor cost rate = $18.00/hr, including overhead costs. There is no tool change or tool cost in the operation. The machine tool is 100% reliable, and the scrap rate = 5%. Determine the number of hours required to complete the batch."

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
What are the coordinates of the point is 1/4 of the way from a (-6, -3) to b (6, 1)? a. (-3, -2) b. (0, -2) c. (-1, 0) d. (3, 2)
Answers: 1
question
Mathematics, 21.06.2019 18:40
What is the value of the expression below? 148+(-6)| + |– 35= 7|
Answers: 2
question
Mathematics, 21.06.2019 23:50
Determine the area of a triangle with (see picture below)
Answers: 1
question
Mathematics, 22.06.2019 02:30
What is the output, or dependent variable of quantity? 1: x 2: f(x) 3: y
Answers: 1
You know the right answer?
The starting work part costs $2.25 in a batch production operation. Batch quantity = 100 parts. Each...
Questions
question
Mathematics, 23.08.2021 14:50
question
English, 23.08.2021 15:00
question
English, 23.08.2021 15:00