subject
Mathematics, 12.02.2020 00:51 hdjsjfjruejchhehd

A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope that weighs 0.5 kg/m. Initially the bucket contains 42 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 14-m level. Find the work done. (Use 9.8 m/s2 for g.) Show how to approximate the required work by a Riemann sum. (Enter xi* as xi.) Express the work as an integral. Evaluate the integral. (Round your answer to the nearest integer in Joules.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Mary used 1/7 of a spool of ribbon to complete 4 projects. she used the same amount of ribbon on each project. how much ribbon did she use on each project?
Answers: 2
question
Mathematics, 21.06.2019 19:10
Can some one me with these questions
Answers: 2
question
Mathematics, 21.06.2019 21:10
The table below shows the approximate height of an object x seconds after the object was dropped. the function h(x)= -16x^2 +100 models the data in the table. for which value of x would this model make it the least sense to use? a. -2.75 b. 0.25 c. 1.75 d. 2.25
Answers: 2
question
Mathematics, 22.06.2019 00:40
B. two events are dependent if the occurrence of one event changes to occurrence of the second event. true or false
Answers: 2
You know the right answer?
A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope t...
Questions
question
History, 02.02.2021 17:10