2-41 the time to complete a construction project is normally distributed with a mean of 60 weeks and a standard deviation of 4 weeks. what is the probability the project will be finished in 62 weeks or less? 62-60/4=2/4=0.5=69146 what is the probability the project will be finished in 66 weeks or less? 66-60/4=6/4=1.5 what is the probability the project will take longer than 65 weeks?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
Iam trying to solve a linear equation for the shoe size of someone 84" tall taking into consideration example 1 is 69" tall with a shoe size of 9 and example 2 is 72 inches tall with a shoe size of 11. i understand that the equation should be y=mx+b and that on the graph the answer is (3,2) but i just don't understand how to create the equation to solve for 84-inches and 60-inches tall questions. after two days, i need .
Answers: 2
question
Mathematics, 21.06.2019 16:40
The graph of which equation includes the points (0, 10) and (10, 11)? y = 10x + 11 y = x + 10 y= 1/10x + 10 y = 1/10x + 11
Answers: 1
question
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 2
question
Mathematics, 21.06.2019 17:30
Based on the figures as marked, /\rqs = —
Answers: 1
You know the right answer?
2-41 the time to complete a construction project is normally distributed with a mean of 60 weeks and...
Questions