subject
Mathematics, 23.01.2020 18:31 angelashaw449

Telco inc., a manufacturing firm, is calculating its monthly productivity report. from the following raw data calculate the multifactor productivity. labor rate machine rate units produced labor hours machine hours 2,000 cost of materials $20,000 cost of energy $20 $15 50,000 4,000 $5,000 a. 0.370 b. 0.625 c. 1.500 d. 1.667

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
The highest point on earth is the peak of mount everest if you climb to the top you would be approximately 29,035 feet above sea level at remembering that amount is 5280 feet percentage of the height of the mountain would you have to climb to reach a point 2 miles above sea level
Answers: 2
question
Mathematics, 21.06.2019 19:00
The annual snowfall in a town has a mean of 38 inches and a standard deviation of 10 inches. last year there were 63 inches of snow. find the number of standard deviations from the mean that is, rounded to two decimal places. 0.44 standard deviations below the mean 2.50 standard deviations below the mean 0.44 standard deviations above the mean 2.50 standard deviations above the mean
Answers: 3
question
Mathematics, 21.06.2019 19:00
Write the pair of fractions as a pair of fractions with a common denominator
Answers: 3
question
Mathematics, 21.06.2019 22:30
Find the condition that the zeros of the polynomial f(x) = x^3+3px^2+3px+r may be in a.p.
Answers: 1
You know the right answer?
Telco inc., a manufacturing firm, is calculating its monthly productivity report. from the following...
Questions
question
Mathematics, 25.08.2021 20:30
question
Biology, 25.08.2021 20:30
question
English, 25.08.2021 20:30
question
History, 25.08.2021 20:30
question
Mathematics, 25.08.2021 20:40
question
Social Studies, 25.08.2021 20:40