Mathematics, 17.01.2020 18:31 kayeeii

In the book advanced managerial accounting, robert p. magee discusses monitoring cost variances. a cost variance is the difference between a budgeted cost and an actual cost. magee describes the following situation:

michael bitner has responsibility for control of two manufacturing processes. every week he receives a cost variance report for each of the two processes, broken down by labor costs, materials costs, and so on. one of the two processes, which we'll call process a , involves a stable, easily controlled production process with a little fluctuation in variances. process b involves more random events: the equipment is more sensitive and prone to breakdown, the raw material prices fluctuate more, and so on.

"it seems like i'm spending more of my time with process b than with process a," says michael bitner. "yet i know that the probability of an inefficiency developing and the expected costs of inefficiencies are the same for the two processes. it's just the magnitude of random fluctuations that differs between the two, as you can see in the information below."

"at present, i investigate variances if they exceed $2,659, regardless of whether it was process a or b. i suspect that such a policy is not the most efficient. i should probably set a higher limit for process b."

the means and standard deviations of the cost variances of processes a and b, when these processes are in control, are as follows: (round your z value to 2 decimal places and final answers to 4 decimal places.):

process a process b
mean cost variance (in control) $ 3 $ 1
standard deviation of cost variance (in control) $5,473 $9,743
furthermore, the means and standard deviations of the cost variances of processes a and b, when these processes are out of control, are as follows:
process a process b
mean cost variance (out of control) $7,651 $ 6,169
standard deviation of cost variance (out of control) $5,473 $9,743

(a)
recall that the current policy is to investigate a cost variance if it exceeds $2,659 for either process. assume that cost variances are normally distributed and that both process a and process b cost variances are in control. find the probability that a cost variance for process a will be investigated. find the probability that a cost variance for process b will be investigated. which in-control process will be investigated more often?

process a
process b
(click to select)process aprocess b is investigated more often.
(b)
assume that cost variances are normally distributed and that both process a and process b cost variances are out of control. find the probability that a cost variance for process a will be investigated. find the probability that a cost variance for process b will be investigated. which out-of-control process will be investigated more often?

process a
process b
(click to select)process aprocess b is investigated more often.
(c) if both processes a and b are almost always in control, which process will be investigated more often?
(click to select)process bprocess a will be investigated more often.
(d)
suppose that we wish to reduce the probability that process b will be investigated (when it is in control) to .3121. what cost variance investigation policy should be used? that is, how large a cost variance should trigger an investigation? using this new policy, what is the probability that an out-of-control cost variance for process b will be investigated?

k=
p(x > 4,775)=

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
The lines shown below are parallel. if the green line has a slope of -1, what is the slope of the red line?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Which inequality has a dashed boundary line when graphed ?
Answers: 2
question
Mathematics, 21.06.2019 20:00
The table shows the age and finish time of ten runners in a half marathon. identify the outlier in this data set. drag into the table the ordered pair of the outlier and a reason why that point is an outlier.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Bernice paid $162 in interest on a loan of $1800 borrowed at 6%. how long did it take her to pay the loan off?
Answers: 1
You know the right answer?
In the book advanced managerial accounting, robert p. magee discusses monitoring cost variances. a c...
Questions
question
Chemistry, 12.07.2019 10:30
question
Mathematics, 12.07.2019 10:30
question
Mathematics, 12.07.2019 10:30
question
Mathematics, 12.07.2019 10:30