subject
Mathematics, 14.01.2020 20:31 JOEFRESH10

Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with the number of workers. suppose also that it takes 200 workers 3 weeks to build 2 miles of highway. how many workers would be needed to build 5 miles of highway in 6 weeks

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Compare these two waves: the blue and orange waves have the same pitch, but the blue wave is louder. the blue and orange waves have the same volume, but the blue wave has a higher pitch. the orange wave has a higher pitch, but the blue wave is louder. the blue wave has a higher pitch, but the orange wave is louder.
Answers: 1
question
Mathematics, 21.06.2019 21:30
If you have a set of parallel lines a and b cut by transversal x, if angle 1 = 167 degrees, what is angle 4 and why. also what is the measure of angle 5 and why? you need to use the names of the angle relationship and explain.
Answers: 1
question
Mathematics, 22.06.2019 00:40
Ineed the question and choices are in the
Answers: 2
question
Mathematics, 22.06.2019 01:30
12.0 million metric tons of beef produced annually in the u.s. out if 65.1 mikkion metric tons of produced annually worldwide
Answers: 1
You know the right answer?
Suppose that the amount of time it takes to build a highway varies directly with the length of the h...
Questions
question
Mathematics, 19.09.2020 01:01
question
English, 19.09.2020 01:01
question
Physics, 19.09.2020 01:01