subject
Mathematics, 03.01.2020 04:31 alyo31500

Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being independent random variables with mean 50 minutes and standard deviation 10 minutes. bob has 30 jobs that he must do in sequence, with the times required to do each of these jobs being independent random variables with mean 52 minutes and standard deviation 15 minutes. ann's and bob's times are:

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Solve the system of equations. y= 2x y= x^2 - 15
Answers: 1
question
Mathematics, 21.06.2019 21:50
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
question
Mathematics, 22.06.2019 00:00
The graph is supposed to show f(x) = 3 sin (x/4+1) - 1/2. which of the following are correctly represented in the graph? select two of the following that apply.
Answers: 1
question
Mathematics, 22.06.2019 02:00
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) − p(x) x a'(x) = xp'(x) − p(x) x2 a'(x) = p'(x) − p(x) x a'(x) = xp'(x) − p'(x) x2 a'(x) = p'(x) − xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 ⇒ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) − xp(x) > 0 p'(x) − xp(x) < 0 xp'(x) − p'(x) > 0 xp'(x) − p(x) < 0 xp'(x) − p(x) > 0
Answers: 2
You know the right answer?
Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being...
Questions
question
English, 13.10.2020 02:01
question
Mathematics, 13.10.2020 02:01
question
English, 13.10.2020 02:01
question
Physics, 13.10.2020 02:01
question
Engineering, 13.10.2020 02:01