subject
Mathematics, 25.12.2019 19:31 SandyRiverty

An efficiency study conducted for elektra electronics showed that the number of space commander walkie-talkies assembled by the average worker during the morning shift t hr after starting work at 8 a. m. is given by n(t) = −t3 + 6t2 + 15t (0 ≤ t ≤ 4).
a. find the rate at which the average worker will be assembling walkie-talkies t hr after starting work.
b. at what rate will the average worker be assembling walkie-talkies at 10 a. m.?
c. how many walkie-talkies will the average worker assemble between 10 a. m. and 11 a. m.?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
What is the order of operations for 2 + (3 - 9) ÷ -3 · 4 in number order 1. subtraction 2. division 3. addition 4. multiplication
Answers: 1
question
Mathematics, 21.06.2019 17:30
Use the net as an aid to compute the surface area of the triangular prism. a) 550 m2 b) 614 m2 c) 670 m2 d) 790 m2
Answers: 1
question
Mathematics, 21.06.2019 18:20
Me solve this problem, and someone clearly explain to me how to solve it.1.) use the value of the discriminant to determine if the given trinomials has 2 real solutions, 1 real solution, or no real solutions.a.  x2  − 4x  − 7 = 0b. 4r2  + 11r  − 3 = 0c. 3m2  + 7 = 0d.  t2  + 2t  + 1 = 0
Answers: 1
question
Mathematics, 21.06.2019 18:30
1.two more than the quotient of a number and 6 is equal to 7 use the c for the unknown number translate the sentence into an equation
Answers: 1
You know the right answer?
An efficiency study conducted for elektra electronics showed that the number of space commander walk...
Questions
question
Mathematics, 20.09.2020 22:01
question
Mathematics, 20.09.2020 22:01
question
Mathematics, 20.09.2020 22:01
question
Chemistry, 20.09.2020 22:01
question
Mathematics, 20.09.2020 22:01
question
Mathematics, 20.09.2020 22:01