subject
Mathematics, 24.12.2019 01:31 alayciaruffin076

An assembly line has 10 stations with times of 1, 2, 3, 4, …, 10, respectively. what is the bottleneck time? 18.18% of the throughput time 550% of the throughput time 50% of the throughput time 1.82% of the throughput time 100% of the throughput time

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The chs baseball team was on the field and the batter popped the ball up. the equation b(t)=80t-16•16+3.5 represents the height of the ball above the ground in feet as a function of time in seconds. how long will the catcher have to get in position to catch the ball before it hits the ground? round to the nearest second
Answers: 3
question
Mathematics, 21.06.2019 18:30
Find the value. a. 0.003 b. 0.03 c. 0.3 d. 3
Answers: 1
question
Mathematics, 21.06.2019 19:00
Which values of p and q result in an equation with exactly one solution? px-43=-42x+q choose all answers that apply: a) p=-43 and q=-43 b) p=42 and q=43 c) p=43 and q=−42 d) p=42 and q=42
Answers: 1
question
Mathematics, 21.06.2019 21:30
Ten members of balin's soccer team ran warm ups for practice. each member ran the same distance. their combined distance was 5/6 of a mile. to find the distance that each member ran, balin wrote the expression below.
Answers: 3
You know the right answer?
An assembly line has 10 stations with times of 1, 2, 3, 4, …, 10, respectively. what is the bottlene...
Questions
question
Mathematics, 30.04.2021 17:00
question
Mathematics, 30.04.2021 17:00
question
Mathematics, 30.04.2021 17:00
question
Mathematics, 30.04.2021 17:00
question
Biology, 30.04.2021 17:00