Asupplier of instrument gauge clusters uses a kanban system to control material flow. the gauge cluster housings are transported five at a time. a fabrication centre produces approximately 10 gauges per hour. it takes approximately two hours for the housing to be replenished. due to variations in processing times, management has decided to keep 25 percent of the needed inventory as safety stock. how many kanban card sets are needed?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
If 20% of a number is 35, what is 50% of that number?
Answers: 2
question
Mathematics, 21.06.2019 16:30
You are updating your garage and the only thing left to paint is your garage day. you're only going to paint the slide that faces the street. the garage door is 9 fert 8inches tall and 120 inches wide. you need to know the surface area of the side of the garage door to determine how much paint to buy. the hardware store sells paint by how much covers a square foot. what is the surface area you should report to the hardware store what is the answer
Answers: 3
question
Mathematics, 21.06.2019 19:00
Which of the expressions (on the photo document i inserted) together represent all solutions to the following equation? 8cos(12x)+4=-4 *the answer should be in degrees.* > i would like for someone to explain the process to find the solutions for this.
Answers: 2
question
Mathematics, 21.06.2019 20:20
Select the correct answer from each drop-down menu. the length of a rectangle is 5 inches more than its width. the area of the rectangle is 50 square inches. the quadratic equation that represents this situation is the length of the rectangle is inches.
Answers: 1
You know the right answer?
Asupplier of instrument gauge clusters uses a kanban system to control material flow. the gauge clus...
Questions
question
Biology, 06.12.2019 10:31
question
Computers and Technology, 06.12.2019 10:31