subject
Mathematics, 18.12.2019 05:31 NoodlesYT

Aproject analyzed using pert has an expected completion time of 65 days and a variance of completion time equal to 16 days. (a) what is the probability of completing the project within 60 days? (b) what is the probability of completing the project within 72 days? (c) what is the completion time that yields a 99.0% chance of completion?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Having a hard time understanding this question (see attachment).
Answers: 2
question
Mathematics, 21.06.2019 21:30
Look at triangle wxy what is the length (in centimeters) of the side wy of the triangle?
Answers: 1
question
Mathematics, 21.06.2019 22:10
Use the spider tool located on page 1 of this activity to draw a 12-pointed star for the new logo. (hint: if the spider rotates 360 degrees -- or 720 degrees or 1080 degrees -- she will be facing in the same direction in which she started. when the spider is done drawing, you want her to be facing in the same direction in which she started. she'll be making 12 rotations, all the same size, so each rotation must be some multiple of 360/12 = 30 degrees.) urgently. been stuck on this problem for around 45 minutes now.! it should be easy if you're smart enough
Answers: 3
question
Mathematics, 21.06.2019 22:30
(a.s."similarity in right triangles"solve for xa.) 10b.) 20c.) 14.5d.) [tex] 6\sqrt{3} [/tex]
Answers: 1
You know the right answer?
Aproject analyzed using pert has an expected completion time of 65 days and a variance of completion...
Questions
question
Mathematics, 05.07.2019 13:30
question
Mathematics, 05.07.2019 13:30