Mathematics, 11.12.2019 23:31 ghanim1963

Dvs: actual crash time, units of 5-day work weeks, denoted by yi, i = a,….,i earliest finish time, units of 5-day weeks, denoted by xi, i = a,….,i the managers want to crash the time to 23 work weeks. min cost (in ($1000s) 2.5ya + 1.67yb + 2yc + 3yd + 2ye + 6yf + 4yg + 2.5 yh (remember that in solver you must include all dvs – so put 0 coefficients for the xi in you objective function setup) s t. ya ≤ 2 yb ≤ 3 yc ≤ 2 yd ≤ 3 ye≤ 2 yf ≤ 3

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
The random variable x is the number of occurrences of an event over an interval of ten minutes. it can be assumed that the probability of an occurrence is the same in any two-time periods of an equal length. it is known that the mean number of occurrences in ten minutes is 5.3. the appropriate probability distribution for the random variable
Answers: 2
question
Mathematics, 21.06.2019 18:00
Arecipe calls for 32 fluid ounces of heavy cream.how many 1 pint containers of heavy cream are needed to make the recipe?
Answers: 2
question
Mathematics, 21.06.2019 20:00
If the simple annual interest rate on a loan is 6, what is the interest rate in percentage per month?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Awasher and a dryer cost $701 combined. the washer costs $51 more than the dryer. what is the cost of the dryer?
Answers: 1
You know the right answer?
Dvs: actual crash time, units of 5-day work weeks, denoted by yi, i = a,….,i earliest finish time,...
Questions
question
Mathematics, 05.07.2020 21:01
question
English, 05.07.2020 21:01
question
Mathematics, 05.07.2020 21:01
question
Mathematics, 05.07.2020 21:01