subject
Mathematics, 02.12.2019 21:31 Lauraemia43

For every part produced by a factory, there are 5 ounces of scrap aluminum that can be recycled. there are16 ounces in 1 pound and 2,000 pounds in 1 ton. how many parts must the factory produce so that there is 1 ton of scrap aluminum for recycling

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
Two different linear functions are shown below with two points given from each function. use slope-intercept form or point-slope form to find the equation of each. linear function a points: (–5, –2), (–5, 7) linear function b points: (7, –5), (–2, –5) function a has: the equation of line a is: function b has: the equation of line b is:
Answers: 1
question
Mathematics, 21.06.2019 14:00
Which product is positive a is 2/5 -8/9 -1/3 -2/7 b is -2/5 8/9 -1/3 -2/7 c is 2/5 8/9 1/3 -2/7 d is -2/5 -8/9 1/3 2/7
Answers: 2
question
Mathematics, 21.06.2019 16:40
This question awards 100 ! i really don’t want to fail i will also mark you !
Answers: 2
question
Mathematics, 21.06.2019 23:40
What is the equation, in point-slope form, of the line that has a slope of 6 and passes through the point (–1, –8)? a. y+8 = 6 (x+1 )
Answers: 1
You know the right answer?
For every part produced by a factory, there are 5 ounces of scrap aluminum that can be recycled. the...
Questions
question
Mathematics, 15.01.2021 19:50
question
Mathematics, 15.01.2021 19:50
question
Arts, 15.01.2021 19:50