subject
Mathematics, 15.11.2019 22:31 asra44

Production line operation is tested for filling weight accuracy using the following hypotheses. hypothesis conclusion and action h 0: = 16 filling okay, keep running h a: 16 filling off standard; stop and adjust machine the sample size is 35 and the population standard deviation is = 0.6. use = .05. do not round intermediate calculations. what would a type ii error mean in this situation?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Which function is increasing? o a. f(x)=(1/15)* o b. f(x)= (0.5)* o c. f(x)=(1/5)* o d. f(x) = 5*
Answers: 1
question
Mathematics, 21.06.2019 17:30
Trent wants to buy 2 packs of trading cards for 3 dollars each. the trading card packs that trent normally buys tend to come in packs of 6, 10, 12, or 15 cards. after selecting 2 packs, trent found that the first pack of cards cost 25 cents per card, and the second pack cost 30 cents per card. trent uses this information to write the equations below in order to compare c, the number of cards in each pack.
Answers: 2
question
Mathematics, 21.06.2019 17:30
Graph the equation. select integers for x
Answers: 1
question
Mathematics, 21.06.2019 22:30
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
You know the right answer?
Production line operation is tested for filling weight accuracy using the following hypotheses. hypo...
Questions
question
Mathematics, 26.02.2021 22:00
question
Mathematics, 26.02.2021 22:00
question
English, 26.02.2021 22:00
question
Mathematics, 26.02.2021 22:00