Mathematics, 11.11.2019 23:31 skyemichellec
The article "time series analysis for construction productivity experiments" (t. abdelhamid and j. everett, journal of construction engineering and management, 1999: 87-95) presents a study comparing the effectiveness of a video system that allows a crane operator to see the lifting point while operating the crane with the old system in which the operator relies on hand signals from a tagman.
three different lifts, a, b, and c, were studied.
lift a was of little difficulty.
lift b was of moderate difficulty.
lift c was of high difficulty.
each lift was performed several times, both with the new video system and with the old tagman system. the time (in seconds) required to perform each lift was recorded. the following tables present the means, standard deviations, and sample sizes.
can you conclude that the mean time to perform a lift of low difficulty is less when using the video system than when using the tagman system?
explain.
Answers: 2
Mathematics, 21.06.2019 17:30
Nine more than four times a number is the same as one less than twice the number. find the number?
Answers: 1
Mathematics, 21.06.2019 22:30
Gabrielle's age is two times mikhail's age. the sum of their ages is 84. what is mikhail's age?
Answers: 2
The article "time series analysis for construction productivity experiments" (t. abdelhamid and j. e...
Mathematics, 20.02.2020 06:34
Social Studies, 20.02.2020 06:34
Social Studies, 20.02.2020 06:34
Physics, 20.02.2020 06:35
Physics, 20.02.2020 06:35
Mathematics, 20.02.2020 06:36