subject
Mathematics, 18.10.2019 01:00 epmooneyham7372

Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line (i. e., a series backup), and plan 2 involves providing a backup for each machine (i. e., a parallel backup). in either case, three additional machines (a, b, and c) would be used with reliabilities equal to the original three.

a. which plan will provide higher reliability?
b. explain why the two reliabilities are not the same.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:20
Which function families have maximums and minimums? 1.)linear absolute value functions and exponential functions 2.) linear absolute value functions and quadratic functions 3.) linear absolute value functions and linear functions 4.) linear absolute value functions and constant functions
Answers: 2
question
Mathematics, 21.06.2019 15:00
Which sum or difference identity would you use to verify that cos (180° - ∅) = -cos ∅? a. sin (α -β) = sin α cos β – cos α sin β b. cos (α -β) = cos α cos β – sin α sin β c. cos (α -β) = cos α cos β + sin α sin β d. sin (α + β) = sin α cos β + cos α sin β
Answers: 2
question
Mathematics, 21.06.2019 15:40
What is the probability of rolling a single die greater than 4
Answers: 1
question
Mathematics, 21.06.2019 19:30
If you could answer these your a life saver
Answers: 2
You know the right answer?
Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectivel...
Questions
question
Biology, 13.08.2020 01:01
question
Geography, 13.08.2020 01:01
question
Mathematics, 13.08.2020 02:01
question
Mathematics, 13.08.2020 02:01