subject
Mathematics, 15.10.2019 02:20 officialrogerfp3gf2s

Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the average of the means is 14 oz. and the average range is 0.4 oz., what is the lower control limit for an x-bar chart for this process?

a. 13.7084 oz.

b. 13.8768 oz.

c. 14.2916 oz.

d. 12.8000 oz.

e. 13.5908 oz.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Aprojectile is thrown upward so that its distance above the ground after t seconds is given by the function h(t) = -16t2 + 704t. after how many seconds does the projectile take to reach its maximum height?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Helll ! 1,400 tons of wheat of two different varieties was delivered to the silo. when processing one variety, there was 2% of waste and 3% during the processing of the second variety of wheat. after the processing, the amount of remaining wheat was 1,364 tons. how many tons of each variety of wheat was delivered to the silo?
Answers: 1
question
Mathematics, 21.06.2019 22:00
Astudent has created the give circuit diagram. it consists of a battery, a resistor, and a light bulb. in one minute, 1.2c of charge flows through the resistor. how much charge flows through the light bulb in one minute?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Analyze the diagram below and complete the instructions that follow. how to find tan
Answers: 2
You know the right answer?
Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the...
Questions
question
History, 27.06.2019 09:30