subject
Mathematics, 09.10.2019 23:10 bree6754

The time for an operator to complete a task is normally distributed with a mean of 9.5 minutes and a standard deviation of 0.6 minutes. the production order for the day requires this task be completed 47 times. a) determine the probability distribution for the total time to complete all 47 tasks. give the name of the distribution and its parameter(s). b) the production manager has promised this job will be complete at the end of the day. what is the probability the operator does not complete all 47 tasks by the end of the day? assume a work day is 7.5 hours accounting for breaks. c) the operations manager disagrees with the production manager. she believes the time to complete the task is better modeled with the 2-parameter weibull distribution with  = 111.5 and  = 449.2 mins. now what is the probability the operator does not complete all 47 tasks by the end of the day?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
The depth of a lake at a certain point, wich is a function of the distance of that point from shore, is 30 feet.
Answers: 1
question
Mathematics, 21.06.2019 17:00
This figure consists of a rectangle and semicircle. what is the perimeter of this figure use 3.14 for pi 60.84m 72.84m 79.68m 98.52m
Answers: 2
question
Mathematics, 21.06.2019 18:40
If f(x) = x+8 and g(x) = 4x- 3, find (f+g)(x)
Answers: 1
question
Mathematics, 21.06.2019 21:00
Bo is buying a board game that usually costs bb dollars. the game is on sale, and the price has been reduced by 18\%18%. what could you find the answer?
Answers: 1
You know the right answer?
The time for an operator to complete a task is normally distributed with a mean of 9.5 minutes and a...
Questions
question
Mathematics, 05.03.2020 23:52