subject
Mathematics, 27.09.2019 16:10 20jessicar598

Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the average of the means is 14 oz. and the average range is 0.4 oz., what is the lower control limit for an x-bar chart for this process?
a. 13.7084 oz.
b. 13.8768 oz.
c. 14.2916 oz.
d. 12.8000 oz.
e. 13.5908 oz.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Find the slope of the line below . enter your answer as a fraction or decimal. use a slash mark ( / ) as the fraction bar if necessary
Answers: 1
question
Mathematics, 21.06.2019 17:00
The variable in a relation who’s value depends on the value of the independent variable is called what?
Answers: 1
question
Mathematics, 21.06.2019 17:30
Miguel’s teacher asks him to color 4/8 of his grid. he must use 3 colors: red, blue, and green. there must be more green sections than red sections. how can miguel color all the sections of his grid to follow all the rules
Answers: 1
question
Mathematics, 21.06.2019 21:40
In a survey of 1015 adults, a polling agency asked, "when you retire, do you think you will have enough money to live comfortably or not. of the 1015 surveyed, 534 stated that they were worried about having enough money to live comfortably in retirement. construct a 90% confidence interval for the proportion of adults who are worried about having enough money to live comfortably in retirement.
Answers: 3
You know the right answer?
Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the...
Questions
question
Biology, 18.08.2019 19:00
question
Social Studies, 18.08.2019 19:00