subject
Mathematics, 18.09.2019 04:10 halohero7

One of the assumptions underlying the theory of control charting is that successive plotted points are independent of one another. each plotted point can signal either that a manufacturing process is operating correctly or that there is some sort of malfunction. even when a process is running correctly, there is a small probability that a particular point will signal a problem with the process. suppose that this probability is 0.07. what is the probability that at least one of 10 successive points indicates a problem when in fact the process is operating correctly? (round your answer to three decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
At dinner, 2/5 of the people had fish and 1/3 had chicken. if everyone else had lamb, what fraction of the people had lamb? and if 40 people had lamb , calculate the total number of people at the dinner.
Answers: 1
question
Mathematics, 21.06.2019 14:00
In trapezoid efgh, m∠hef=(4x2+16)∘ and m∠gfe=(5x2+12)∘. find the value of x so that efgh is isosceles. i'm desperate.
Answers: 3
question
Mathematics, 21.06.2019 16:00
Aline has a slope of 1/4 and passes through point (0.4,-1/2). what is the value of the y-intercept?
Answers: 2
question
Mathematics, 21.06.2019 20:00
Which statement about the annual percentage rate (apr) is not true?
Answers: 3
You know the right answer?
One of the assumptions underlying the theory of control charting is that successive plotted points a...
Questions
question
Mathematics, 25.02.2020 02:16
question
English, 25.02.2020 02:17