subject
Mathematics, 14.09.2019 03:30 hoolio75

One batch of 25 units requires the following processing times per unit: move time for raw materials to cutting department, 6 minutes; cutting department, 4 minutes; move time to sewing department, 3 minutes; sewing department, 10 minutes; move time to packaging department, 2 minutes; and packaging department, 4 minutes. a. how much of the time spent to produce the units is value-added time? b. determine the total within-batch wait time. c. calculate the total lead time for the batch.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
How far is x from 5 on a number line?
Answers: 1
question
Mathematics, 21.06.2019 21:40
The sides of a parallelogram are 24cm and 16cm. the distance between the 24cm sides is 8 cm. find the distance between the 16cm sides
Answers: 3
question
Mathematics, 21.06.2019 22:00
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 2
question
Mathematics, 22.06.2019 01:30
What is the surface area of the sphere?
Answers: 1
You know the right answer?
One batch of 25 units requires the following processing times per unit: move time for raw materials...
Questions