subject
Mathematics, 17.08.2019 18:10 fyegirl12

Elatively high volume in winter months. the service rate of a postal clerk is 0.75 customers per minute. the post office counter has a maximum of three workstations. the target maximum time a customer waits in the system is 5 minutes. for a particular monday morning, the anticipated arrival rate is 1.3 customers per minute. assume two out of three workstations are open. with an expected growth to 2.1 customers per minute, the corresponding wait time in the system (3 decimal places) is

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
In triangles abc and wxy, a=w and b=x which of the following must be true to prove abc=wxy by the aas theorem? a.ab=bc b.bc=xy c.ab=wx d.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Afootball is throw by a quarterback to a receiver
Answers: 2
question
Mathematics, 21.06.2019 23:20
For which pairs of functions is (f•g)(x)=12x? f(x)=3-4x and g(x)=16x-3 f(x)=6x2 and g(x)= 2/x f(x)= and g(x) = 144x f(x)=4x and g(x) =3x
Answers: 1
question
Mathematics, 22.06.2019 00:00
An equation in slope-intersept form the lines that passes thought (-8,1) and is perpindicular to the y=2x-17.
Answers: 1
You know the right answer?
Elatively high volume in winter months. the service rate of a postal clerk is 0.75 customers per min...
Questions
question
Mathematics, 26.02.2021 18:40
question
Mathematics, 26.02.2021 18:40
question
Chemistry, 26.02.2021 18:40
question
Mathematics, 26.02.2021 18:40
question
Mathematics, 26.02.2021 18:40