subject
Mathematics, 17.08.2019 17:20 hgfddfg

2) an engineer is trying to formulate the minimum cost set of materials to use in an upcoming project. there are four groups of materials, and exactly one item from each group must be selected. the costs are given below: group a cost group b cost group c cost group d cost a1 10 b1 2 c1 8 d1 5 a2 12 b2 1 c2 9 d2 8 a3 16 c3 11 d3 9 c4 13 if b2 is selected, then a3 must be used. we can use at most one of a1, b1, c1, and d1, while we must have at least two of a3, c3, c4, and d3. finally, d1 cannot be used unless a2 or c4 is used. formulate and solve a 0-1 integer programming model that will determine the optimal solution.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
If a is a nonzero real number then the reciprocal of a is
Answers: 2
question
Mathematics, 21.06.2019 21:00
The paint recipe also calls for 1/4 cup of food coloring. tyler says mrs.mcglashan will also need 6 cups of food coloring. do u agree or disagree? explain.
Answers: 2
question
Mathematics, 21.06.2019 21:00
Which expression is equal to (21)(7)(3x) using the associative property? (21 · 7 · 3)x (7)(21)(3x) 32(7 + 3x) (3x)(7)(21)
Answers: 2
question
Mathematics, 22.06.2019 00:00
Asequence is a function whose is the set of natural numbers
Answers: 1
You know the right answer?
2) an engineer is trying to formulate the minimum cost set of materials to use in an upcoming projec...
Questions
question
Mathematics, 01.03.2021 21:00
question
Mathematics, 01.03.2021 21:00
question
Mathematics, 01.03.2021 21:00
question
Mathematics, 01.03.2021 21:00
question
Social Studies, 01.03.2021 21:00