subject
Mathematics, 03.08.2019 02:20 andres2865

Arope factory produces ropes that have been measured to be able to lift 500 pounds, with a standard deviation of 6
pounds. one monday, the quality department measures the strength of 30 ropes, and finds them to have an average of
480 pounds with a standard deviation of 1 pound. if the plant only ships production that it is 99% sure is able to lift 500
pounds, what does it do with monday's production?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Awater tank holds 18000 gallons. how long will it take for the water level to reach 6000 gallons if the water is used at anaverage rate of 450 gallons per day
Answers: 1
question
Mathematics, 22.06.2019 02:30
Harry owes the bank money. to repay his debt, he paid $150 back to the bank each month. after 10 months, his remaining debt was $6900. what was the original amount of harry's debt? how long did it take harry to pay back his entire debt?
Answers: 2
question
Mathematics, 22.06.2019 03:30
If a seller prepaid the taxes of $4,400 and the closing is set for may 19, using the 12 month/30 day method what will the buyer owe the seller as prorated taxes?
Answers: 1
question
Mathematics, 22.06.2019 06:00
What is the simplified ratio of 5 meters to 100 cenimeters
Answers: 1
You know the right answer?
Arope factory produces ropes that have been measured to be able to lift 500 pounds, with a standard...
Questions