Mathematics, 29.07.2019 20:20 widnickab

Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois, factory are as follows: activity | time (in hours) | immediate predecessors a | 6.0 | -- b | 7.2 | -- c | 5.0 | a d | 6.0 | b, c e | 5.0 | b, c f | 7.7 | d g | 4.0 | e, f (a) draw the project network using aon. (b) identify the critical path. (c) what is the expected project length? (d) draw a gantt chart for the project.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Which is the equation of an ellipse with directrices at x = ±4 and foci at (2, 0) and (−2, 0)?
Answers: 3
question
Mathematics, 21.06.2019 17:30
The table shows the balance of a money market account over time. write a function that represents the balance y (in dollars) after t years.
Answers: 3
question
Mathematics, 21.06.2019 17:30
For each proportion find the unknown number x 1/5/8=×/15
Answers: 1
question
Mathematics, 22.06.2019 01:40
Amass weighing 16 pounds stretches a spring 8/3 feet. the mass is initially released from rest from a point 2 feet below the equilibrium position, and the subsequent motion takes place in a medium that offers a damping force that is numerically equal to 1/2 the instantaneous velocity. find the equation of motion if the mass is driven by an external force equal to f(t)=cos(2t).
Answers: 2
You know the right answer?
Task time estimates for the modification of an assembly line at jim goodale's carbondale, illinois,...
Questions
question
Physics, 22.07.2019 19:20
question
Physics, 22.07.2019 19:20
question
Biology, 22.07.2019 19:20