subject
Mathematics, 25.06.2019 06:40 batmanmarie2004

Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Yao xin puts 3/10 liters of potting soil in each pot for planting flowers. she has 5 2\3 liters of potting soil. how many pots can yao xin fill?
Answers: 3
question
Mathematics, 21.06.2019 23:00
Bobs burgers bam has a special deal of 4 hamburgers for $6. at that rate, how much should it cost to buy 3 hamburgers?
Answers: 1
question
Mathematics, 22.06.2019 00:10
Hello, i need compare km^2 and km. what's difference in this?
Answers: 2
question
Mathematics, 22.06.2019 02:00
Milk and ice cream are mixed together for a recipe. the total volume of the mixture is 1 cup. if the milk contains 2% fat, the cream contains 18% fat ,and the mixture contains 6% fat ,how much cream is in the mixture
Answers: 1
You know the right answer?
Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line w...
Questions
question
Mathematics, 20.09.2019 00:30
question
Computers and Technology, 20.09.2019 00:30
question
English, 20.09.2019 00:30
question
Mathematics, 20.09.2019 00:30
question
English, 20.09.2019 00:30