subject
Mathematics, 21.06.2019 20:50 brea2006

An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Which basic geometric term has no width, no length, and no thickness? line b. point c. angle d. plane
Answers: 2
question
Mathematics, 21.06.2019 18:30
What describes horizontal cross section of the right rectangle 6m 8m 5m
Answers: 1
question
Mathematics, 21.06.2019 19:00
The following division is being performed using multiplication by the reciprocal find the missing numbers is 5/12 divided by x/3 equals 5/12 times x/10 equals 1/x
Answers: 2
question
Mathematics, 21.06.2019 20:00
What is the x-intercept and y-intercept of the equation 2x+1. 2o
Answers: 2
You know the right answer?
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the st...
Questions
question
Chemistry, 11.12.2021 08:10
question
Mathematics, 11.12.2021 08:10
question
World Languages, 11.12.2021 08:10
question
History, 11.12.2021 08:10
question
World Languages, 11.12.2021 08:10
question
Mathematics, 11.12.2021 08:10
question
Mathematics, 11.12.2021 08:10
question
Business, 11.12.2021 08:20