subject
Mathematics, 24.06.2019 22:50 carvarceuanmoss

Lockheed martin, the defense contractor designs and build communication satellite systems to be used by the u. s. military. because of the very high cost the company performs numerous test on every component. these test tend to extend the component assembly time. suppose the time required to construct and test (called build time) a particular component is thought to be normally distributed, with a mean equal to 45 hours and a standard deviation equal to 6.75 hours. to keep the assembly flow moving on schedule, this component needs to have a build time between 37.5 and 54 hours. find the propability that the bulid time will be such that assembly will stay on schedule.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
The polynomial function of least degree with a leading coefficient of 1 is: f(x) = x3 + ax2 + bx + c
Answers: 1
question
Mathematics, 21.06.2019 16:00
Quadrilateral wxyz is on a coordinate plane. segment yz is on the line x+y=7 and segment xw is on the line x+y=3. which statement proves how segments yz and xw are related
Answers: 1
question
Mathematics, 21.06.2019 17:00
Let f(x)=2x and g(x)=2x. graph the functions on the same coordinate plane. what are the solutions to the equation f(x)=g(x) ?me asap
Answers: 2
question
Mathematics, 21.06.2019 23:00
Car a and car b were in a race .the driver of car b claimed that his car was twice as fast as car a
Answers: 3
You know the right answer?
Lockheed martin, the defense contractor designs and build communication satellite systems to be used...
Questions
question
Mathematics, 28.11.2019 15:31
question
Mathematics, 28.11.2019 15:31