Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? the standard normal equation can be applied as follows: z = startfraction left parenthesis due date minus expected date of completion right parenthesis over sigma subscript p endfraction , where z is the number of standard deviations the due date or target date lies from the mean or expected date and sigma subscript p is the project standard deviation, which is the square root of the variance. for the due date of 17 months, value of z based on the given information = negative 2.000 (round your response to two decimal places). using the standard normal table , the probability that the project will be completed in 17 months = nothing (round your response to four decimal places).

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
I’m on question 7 it says a covered water tank is in the shape of a cylinder the tank has a 28 inch diameter and a height of 66 inches to the nearest square inch what is the surface area of the water tank
Answers: 2
question
Mathematics, 21.06.2019 22:50
Aweekly newspaper charges $72 for each inch in length and one column width. what is the cost of an ad that runs 2 column inches long and 2 columns wide? its not 288
Answers: 1
question
Mathematics, 22.06.2019 00:20
Which shows how to solve the equation 3/4x=6 for x in one step?
Answers: 2
question
Mathematics, 22.06.2019 03:50
Add the two expressions 4.6 x -3 + -5.3 x + 9
Answers: 1
You know the right answer?
Using pert, adam munson was able to determine that the expected project completion time for the cons...
Questions
question
Mathematics, 27.10.2020 22:10
question
English, 27.10.2020 22:10
question
Physics, 27.10.2020 22:10
question
English, 27.10.2020 22:10