subject
Mathematics, 17.10.2019 07:20 cajunldy2001

Ateacher needs 70 lengths of string cut to 40cm each. if balls of string are 10 m long, how many balls will be needed.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
How much dextrose 70% must be mixed with dextrose 5% to prepare 1,000 ml of dextrose 20%?
Answers: 1
question
Mathematics, 21.06.2019 19:20
Askyscraper is 396 meters tall. at a certain time of day, it casts a shadow that is 332 meters long.at what angle is the sun above the horizon at that time?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Write an equation for the function that includes the points (2,100)and (3,100)
Answers: 2
question
Mathematics, 21.06.2019 22:30
Abucket of paint has spilled on a tile floor. the paint flow can be expressed with the function p(t) = 6(t), where t represents time in minutes and p represents how far the paint is spreading. the flowing paint is creating a circular pattern on the tile. the area of the pattern can be expressed as a(p) = 3.14(p)^2 part a: find the area of the circle of spilled paint as a function of time, or a[p(t)]. show your work. part b: how large is the area of spilled paint after 8 minutes? you may use 3.14 to approximate pi in this problem.
Answers: 2
You know the right answer?
Ateacher needs 70 lengths of string cut to 40cm each. if balls of string are 10 m long, how many bal...
Questions
question
Geography, 25.08.2019 00:50