Mathematics, 25.06.2019 01:00 georgesarkes12
At chrissy's clothes warehouse, it takes fraction 2 over 5 of a day to complete fraction 1 over 10 of an order of t-shirts. at this rate, how long will it take to complete the entire order of t-shirts? 4 days mixed number 10 and 2 over 5 days mixed number 12 and 1 over 2 days 25 days
Answers: 2
Mathematics, 21.06.2019 15:40
Each of the walls of a room with square dimensions has been built with two pieces of sheetrock, a smaller one and a larger one. the length of all the smaller ones is the same and is stored in the variable small. similarly, the length of all the larger ones is the same and is stored in the variable large. write a single expression whose value is the total area of this room. do not use any method invocations.
Answers: 1
Mathematics, 21.06.2019 17:00
Given f(x)=2x^2-8x+6 and g(x)=3x-1 find f(x) +g(x) a. 2x^2+5x+5 b.2x^2-11x+7 c. 2x^2-5x+5 d.2x^2-5x-5
Answers: 1
Mathematics, 21.06.2019 17:00
The sum of the reciprocal of a positive number and the reciprocal of 2 more than the number is 3/4 equation: the number is
Answers: 2
Mathematics, 21.06.2019 21:30
For the inequality |c| < |d| to be true, which of the following must be true?
Answers: 2
At chrissy's clothes warehouse, it takes fraction 2 over 5 of a day to complete fraction 1 over 10 o...
Mathematics, 09.02.2022 16:50
SAT, 09.02.2022 16:50
Mathematics, 09.02.2022 16:50
Chemistry, 09.02.2022 17:00