Mathematics, 01.07.2019 21:30 haileyjones732
An assembly line produces 20 items per hour. if the line runs 24 hours per day, 7 days a week, how many items are made by this machine in one month?
Answers: 2
Mathematics, 21.06.2019 18:30
Analyze the graph of the cube root function shown on the right to determine the transformations of the parent function. then, determine the values of a, h, and k in the general equation.
Answers: 1
Mathematics, 21.06.2019 21:00
When solving this problem: 3025/5.5 = a/90.75 you get 49912.5 which would be the length of one of the sides of a square when the area is only 90.75 inches. is that answer correct, why, and how is it possible?
Answers: 1
Mathematics, 22.06.2019 00:30
The measures of two supplementary angles are (2x + 10)° and (8x + 10)°. what is the measure of the larger angle? a. 16° b. 44° c. 14° d. 138°
Answers: 2
Mathematics, 22.06.2019 01:00
Two trains leave stations 546 miles apart at the same time and travel toward each other. one train travels at 95 miles per hour while the other travels at 115 miles per hour l. how long will it take for the two trains to meet
Answers: 3
An assembly line produces 20 items per hour. if the line runs 24 hours per day, 7 days a week, how m...
English, 19.02.2021 14:00
Biology, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
English, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
Mathematics, 19.02.2021 14:00
History, 19.02.2021 14:00
German, 19.02.2021 14:00