subject
Mathematics, 06.07.2019 03:00 marquezsturgis

A271⁄2-mile stretch of road needs repaving. a company bid on the repaving project, saying they could repave 21⁄4 miles of road per week. how many weeks will the company take to completely repave the stretch of road?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
You are shooting hoops after school and make 152 out of a total of 200. what percent of shots did you make? what percent did you miss? show proportion(s).
Answers: 1
question
Mathematics, 21.06.2019 22:30
What is the distance between a and b? round your answer to the nearest tenth. a coordinate plane is shown. point a is located at negative 1, 5, and point b is located at 4, 1. a line segment connects the two points.
Answers: 1
question
Mathematics, 21.06.2019 22:30
21 a stick 7 inches long is broken into two pieces, so that one piece is twice as long as the other one. how long are the two pieces?
Answers: 1
question
Mathematics, 22.06.2019 00:00
If (x + 8) is a factor of f(x), which of the following must be true? both x = –8 and x = 8 are roots of f(x). neither x = –8 nor x = 8 is a root of f(x). f(–8) = 0 f(8) = 0
Answers: 3
You know the right answer?
A271⁄2-mile stretch of road needs repaving. a company bid on the repaving project, saying they could...
Questions
question
Mathematics, 04.06.2021 01:00
question
Mathematics, 04.06.2021 01:00
question
Chemistry, 04.06.2021 01:00