subject
Mathematics, 12.07.2019 21:30 Kylehc21

The average hourly earnings for a construction worker is projected to be $24.50 in 2012. jason wants to join the construction work force after he graduates in 2012. his friend tells him that average hourly earnings for construction workers will rise by 2% from 2009 to 2012. based on the data below, assuming that the projected hourly earnings are correct, is jason’s friend’s statement accurate?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Another type of subtraction equation is 16-b=7. explain how you would sole this equation then solve it.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Suppose you are an avid reader and are looking to save money on the cost of books instead of paying about $20 for each book, you decide to look into purchasing a kindle for $120 you can purchase e-books for about $5 each 1. find the slope-intercept equation for the cost of the hard copy of books using x to represent the number of books 2. find the slope-intercept equation for the cost of the kindle with cost of e-books using x to represent the number of books
Answers: 1
question
Mathematics, 21.06.2019 21:00
Estimate the area under the curve f(x) = 16 - x^2 from x = 0 to x = 3 by using three inscribed (under the curve) rectangles. answer to the nearest integer.
Answers: 1
question
Mathematics, 21.06.2019 21:40
Ineed your ! i was to turn this into pond first thing i gotta do is outline the inside with this plastic how big should i cut the plastic the height: 10 1/2” the length: 40” the width: 12” me !
Answers: 1
You know the right answer?
The average hourly earnings for a construction worker is projected to be $24.50 in 2012. jason wants...
Questions
question
Mathematics, 13.10.2019 22:10
question
Mathematics, 13.10.2019 22:10
question
Mathematics, 13.10.2019 22:10
question
Chemistry, 13.10.2019 22:10
question
Mathematics, 13.10.2019 22:10