Mathematics, 16.07.2019 08:00 lusan4u
Acertain project can be completed by 28 men in 90 days. the numbers of men needed varies inversely to the time needed to complete the project. if the contractor wants to complete the project in 72 days, how many men does he have to have working?
Answers: 1
Mathematics, 21.06.2019 16:00
One card is dealt from a 52 card deck. find the probability that the dealt card is a 4 or a black 7
Answers: 2
Mathematics, 21.06.2019 17:00
The table below shows the height of a ball x seconds after being kicked. what values, rounded to the nearest whole number, complete the quadratic regression equation that models the data? f(x) = x2 + x + 0based on the regression equation and rounded to the nearest whole number, what is the estimated height after 0.25 seconds? feet
Answers: 2
Mathematics, 21.06.2019 18:00
Ageologist had two rocks on a scale that weighed 4.6 kilograms together.rock a was 0.5 of the total weight.how much did rock a weigh?
Answers: 1
Mathematics, 21.06.2019 22:10
Find the volume of the solid whose base is the region bounded by f(x), g(x) and the x-axis on the interval [0, 1], and whose cross-sections perpendicular to the y-axis are squares. your work must show the integral, but you may use your calculator to evaluate it. give 3 decimal places for your answe
Answers: 3
Acertain project can be completed by 28 men in 90 days. the numbers of men needed varies inversely t...
Mathematics, 04.11.2021 14:00
History, 04.11.2021 14:00
Mathematics, 04.11.2021 14:00
Social Studies, 04.11.2021 14:00
History, 04.11.2021 14:00
English, 04.11.2021 14:00
Mathematics, 04.11.2021 14:00
Advanced Placement (AP), 04.11.2021 14:00
Mathematics, 04.11.2021 14:00