subject
Mathematics, 20.07.2019 19:30 Prettypq

Awork cell is scheduled to build 120 digital light processor (dlp) assemblies each week. these assemblies are later installed into home theater projection systems. the work cell has 7.5 hours of productive work each day, six days per week. what is takt time for this cell? express your answer in minutes rounded to one decimal place.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
For the given quadratic equation convert into vertex form, find the vertex and find the value for x=6 y=-2x^2+2x+2
Answers: 2
question
Mathematics, 21.06.2019 19:00
Use the formulas a = x 2 – y 2, b = 2xy, c = x 2 + y 2 to answer this question. one leg of a right triangle has length 11 and all sides are whole numbers. find the lengths of the other two sides. the other leg = a0 and the hypotenuse = a1
Answers: 2
question
Mathematics, 21.06.2019 20:00
The multiplicative property of equality states that for real numbers a, b, c, and d, if a = b and c = d, then ac = bd. true false
Answers: 1
question
Mathematics, 21.06.2019 21:30
Aboard 60 in. long is cut two parts so that the longer piece is 5 times the shorter. what are the length of the two pieces?
Answers: 1
You know the right answer?
Awork cell is scheduled to build 120 digital light processor (dlp) assemblies each week. these assem...
Questions
question
Social Studies, 20.02.2020 20:57