subject
Engineering, 28.03.2022 22:50 angelak461

A homeowner has enough money to hire four workers for the construction of a second kitchen in his basement. he has already hired an electrician, a plumber, and a terrazzo worker. what other worker should he hire and why? a cabinetmaker, because cabinets will need to be built and installed

a general carpenter, because she can handle all of the other aspects of the project

a plasterer, because the kitchen will require drywall to be hung

a tile worker, because new flooring and a backsplash will need to be installed

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
A homeowner has enough money to hire four workers for the construction of a second kitchen in his ba...
Questions
question
Mathematics, 30.10.2020 04:20
question
Mathematics, 30.10.2020 04:20
question
English, 30.10.2020 04:20
question
Mathematics, 30.10.2020 04:20
question
Mathematics, 30.10.2020 04:20
question
Mathematics, 30.10.2020 04:20